Projects & schedule

Keep the job plan and the job costs together.

Bring the approved scope into the job, coordinate the schedule, and compare budget with actual costs. General contractors and specialty trades can keep the office, field, and client working from the same job information.

Start with the estimate you already built. Keep scope, costs, crew assignments, and progress connected as the work changes.

Track the job at the estimated-item level

Tasks stay linked to estimated items. Crew hours allocated to those tasks roll back into the item budget, so you can compare estimated and actual hours for each part of the scope.

Keep your working tabs open

Move between the project schedule, an estimate, crew messages and a Wilson report in the same workspace. Keep the information you need within reach as you work.

Start the job with the scope already in place

Turn an approved estimate into a project with the scope, schedule, payment schedule, and contract file carried forward. Spend less time setting up the same job twice.

Get a first draft of the schedule

The approved scope provides a starting task schedule for your team to review and plan around.

Keep linked tasks moving together

When you change task dates, linked tasks can reschedule with them. Keep the sequence of work connected as the plan changes.

Catch conflicting task links

WilsonBuilds stops a dependency that would create a loop, so you can correct the sequence before it disrupts the plan.

The refusal toast on a real 50-task schedule — both tasks in the cycle, Install — Ceilings and Trim and finish — Ceilings, visible in the list beneath it

See what puts the finish date at risk

Review critical-path tasks and float. When scheduled dates conflict with task dependencies, a warning helps you see where the plan needs attention.

Float shown on every row, and the amber banner flagging a task scheduled earlier than its links allow — the flagged row itself, in place, with nothing moved

Spot cost overruns by work package

Compare estimated and actual labor, material, equipment, subcontract, and other costs. Recorded hours and expenses help you see where a work package is running over budget.

HVAC / Mechanical's cost-type breakdown — Labor $8,695.08 est vs $17,173.44 actual (over) and Subcontract $20,288.52 vs $18,400.00 (under), rolled up from real logged costs

Connect crew assignments to the field

A crew member’s job assignment controls where they can clock in, keeping office scheduling and field access connected.

Share the schedule outside your team

Export the task schedule to CSV for a subcontractor, a client, or your own records.

The Work tab's Export control, and the confirmation that the schedule exported to CSV

Keep a record of what happened on site

Daily logs and inspections stay with the relevant phase of the job. Review progress, notes, and inspection outcomes when you need the context.

Daily Logs, dated and detailed — Thursday's entry naming 5 workers, 40 hrs, weather, and tomorrow's plan
The same project's Inspections panel — Rough Electrical passed, Rough Mechanical failed with a reinspection note

Bring approved changes into the plan

An approved change order can add tasks and dependency links to the schedule, so additional scope can be reflected in the timeline.

Keep customers informed as work progresses

Your client can review project progress and payment milestones in their portal, using the same work packages your team tracks.

The client portal — Overall Progress at 20%, 2 of 10 items completed
The full Billing Schedule behind it — all ten payment milestones, each with its own date and percentage